On Tuesday September 26th the length of South Road will be closed from its junction with Southlands Drive to its junction with Mill Lane. |
This is required to enable National Grid to replace decayed electricity poles and reconductoring works for a maximum period of four days. The road will only be restricted as and when traffic signs are in position and may not be for the whole of the period but only for so long as is necessary to execute the works. This is anticipated to be for two days.
|